Product Introduction

The Bailey bridge is a prefabricated, long-span steel bridge system specifically designed for crossing rivers. This product cleverly combines the superior spanning capacity of a suspension bridge with the modular assembly advantages of Bailey beams. It uses high-strength steel strands as the main cables, and standardized steel bridge decks are securely suspended between anchor points on both banks via rigid suspenders. This structure fully utilizes the excellent tensile properties of steel, making it an ideal solution for medium to large spans of 60 to 300 meters. It is not only lightweight and stable but also possesses excellent terrain adaptability.

All components of the Bailey bridge are prefabricated in the factory, requiring only simple assembly on site, enabling rapid erection and significantly shortening the construction period. This makes it particularly suitable for emergency rescue or projects with tight deadlines. Furthermore, the bridge system is highly reusable, easy to disassemble, and suffers minimal wear and tear, allowing for multiple reuses and greatly reducing the overall cost over its entire lifecycle. It is a preferred bridge type that balances economic benefits and engineering efficiency.

Technical indicators

Basic parameters
Product Name Bailey Bridge
alternative name Bailey bridge; prefabricated highway steel bridge, steel temporary bridge, steel trestle bridge; temporary access road; temporary bridge; Bailey bridge
model Type 321, Type 200; GWD type
Common truss plate models Type 321 Bailey sheet; Type 200 Bailey sheet; GWD Bailey sheet, etc.
The largest single span of the steel bridge design 300 meters
Standard lane width of steel bridge Single lane 4 meters; dual lane 7.35 meters; design can be customized to meet specific requirements.
Load rating Automotive Class 10, Automotive Class 15, Automotive Class 20; Tracked Class 50; Trailer Class 80; Single Vehicle 40 Tons; AASHTO HS20, HS25-44, HL93, BS5400 HA+HB; Domain-A; Domain-B; Highway Class I; Highway Class II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc.
Design Scheme Choose the appropriate bridge configuration or suspension bridge scheme based on the span and load.
Main materials of steel bridge GB Q345B
Connecting pin material 30CrMnTi
Connecting bolt grade Grade 8.8 high-strength bolts; Grade 10.9 high-strength bolts
Surface corrosion protection Hot-dip galvanizing; painting; heavy-duty anti-corrosion paint for steel structures; asphalt paint; anti-slip aggregate treatment for bridge decks, etc.
Bridge erection methods Cantilever launching method; hoisting method; floating method; on-site assembly method; earth-filling construction method, etc.
Installation will take time. After the bridge abutments and other conditions are met, 30-60 sunny days are required (depending on the bridge length and site conditions).
Installation requires workers. 15-20 people (to be determined based on site conditions)
Installation requires equipment. Cranes, winches, jacks, chain hoists, welding machines, generators, etc. (can be adjusted according to site conditions)
Features of steel bridges Large span, no need for piers, quick assembly, interchangeable, detachable, and long service life.
Authentication ISO,CCIC,BV,SGS,CNAS
Implementation Standards JT-T/728-2008

Application scenarios